The Redux 3 file ReduxCore/inc/fields/typography/typography.php is still in use by Industrio
. Please contact the author of this theme (NOT Redux support, we have no control over this issue). They need to update their project to use Redux 4 and discontinue use of this file. It will soon be removed from Redux.
Industrial energy use accounts for nearly 37% of global consumption — and the commissioning phase holds untapped potential for immediate savings. FARAMED’s approach turns commissioning into a foundation for long-term energy efficiency.
In a world where energy costs and carbon emissions are under ever-growing scrutiny, industrial players are under pressure to optimize — not just during operations, but from the very start of asset deployment. At FARAMED, we believe commissioning is not only about testing functionality — it’s a unique opportunity to embed intelligence and efficiency from day one.
Our integrated commissioning approach goes beyond traditional loop checks. It includes:
Advanced programmable logic controllers (PLCs) configured for energy optimization
Real-time monitoring systems that detect waste during start-up
Smart sequencing to reduce peak demand and eliminate unnecessary standby consumption
Whether on a refinery, petrochemical site, or FPSO, our mission is clear: ensure that systems start smart — not just start running.
One of the most overlooked sources of waste in industrial commissioning is fatal heat loss, especially in energy-intensive sectors like refining and gas treatment. Studies estimate that up to 94.3 TWh of waste heat is lost annually in France’s industrial sector alone.
FARAMED technicians are trained to program control systems to recover and repurpose residual heat, synchronizing this logic with plant-wide automation platforms. This not only boosts efficiency but also reduces cooling loads and operating stress on ancillary systems.
FARAMED combines:
Specialized hardware such as mobile control rooms and wireless communication systems
Experienced personnel skilled in PLC programming, loop analysis, and thermal management
Sector-specific configurations designed to optimize each system’s energy footprint
Our solutions are not generic — they are tailored by industry and adapted on site, in coordination with client energy teams and control engineers.
Sector | Estimated Avoidable Losses (kWh) | Potential Recovery with FARAMED (%) | Projected Savings (kWh) |
---|---|---|---|
Refining | 2,800,000 | 25–30% | ~750,000 |
Petrochemicals | 4,200,000 | 20–25% | ~900,000 |
Gas Processing | 3,100,000 | 30–35% | ~1,050,000 |
Offshore (FPSO) | 2,500,000 | 25–30% | ~675,000 |
Figures based on average facility sizes during commissioning. Detailed estimates available upon request.
Efficiency isn’t just a goal — it’s a configuration. And at FARAMED, we make it operational from day one.
Whether you’re deploying a new gas module or revamping an energy-intensive site, our integrated commissioning services deliver both speed and sustainability.
Want to reduce your energy footprint before operations begin?
Post A Comment